Shangri La

Shangri La

Tuesday, September 27, 2011

September 26, 2011

I'm taking a break from the usual manic Monday routine to do some work at the cabin. Up at 5, packed and on the road by 6:10. I’m thinking I’d like to see if Brattleboro has cleaned up since the Hurricane, but the traffic into town is significantly backed up and I hop right back onto the highway.

A few more exits up I find I’m able to travel the roads that were blocked during my last trip. There’s earth-moving equipment in many places along the river, apparently rebuilding the riverbanks at critical spots. There are two mobile homes that appear to be a total loss, one house that that is marginal, and a covered bridge that made it through but took some heavy damage. Pretty impressive from a ‘river’ that is usually 1 – 4 feet deep at most.

After a stop at the village store for a croissant and the local papers, I’m at the cabin by 9 AM. The leaves are already beginning to turn and the roads have a picturesque dusting of the ones that have already fallen. It would be the perfect fall day except that it’s a little too hot and already somewhat humid.

My goal is to complete the electrical and plumbing work – of which very little remains. The first task is to correct the dodgy job I did installing the front porch light – mounting the light to the wall and feeding the wires to a gang box facing the cabin interior. What was I thinking? Even the electrician left a note saying “uh, you might want to consider…” 15 minutes, a hole saw and an round gang box and I can hold my head up at an IBEW meeting again. Not that I'd know where to find one.

That fix was the only thing preventing me from finishing the downstairs insulation, however, so I decide to put it up now rather than waiting until the LSW and The Boy are with me. Insulation is deceptively nasty, and the less we work with it while we’re trying to enjoy the place the better. This leads to the first ‘son of a bitch!’ moment when I realize that the two rolls of R19 I bought were for 16” – rather than 24” – framing. How could I possibly have missed that? I knew they seemed like too much of a bargain when I bought them. I decide to make it work, however, and spend the next couple of hours finishing the downstairs insulation.

I consider turning back to the electrical after lunch, but the temptation to cover the insulation with dry wall is overwhelming and I give in. This leads to the second SOAB moment when I cut two leftover pieces of wall board only to find that they are both 1’ too short. Yes, Norm, I hear you: Measure TWICE, cut ONCE. Aggravating the situation, I find that I need to change the framing inside the closet to mount them. No surprise, as SOAB moments are invariable followed by ‘more work than expected’ experiences. The reframing I do here opens my eyes to 3 other minor framing tasks I’ve been stalling on, and I figure I might as well address them while the mitre saw is out and the Paslode is cooperating.

I use the two short pieces of drywall I’ve cut and patch in smaller pieces above. It’s the entry closest, and I reason that I’ll cover the seams with a shelf. I then put the remaining insulation in the loft, and – with my new framing-ray vision - realize I have additional framing to do on the gable walls in order to effectively mount both the wall board and pine ceiling. SOAB! (And MWTE.)

At this point it is 2:30, and I still have to unload the kitchen/entry tile backer boards from the truck and clean up before leaving, so I call it a day. Looking around, I feel like I got very little done. As always.

On the way back, I travel through Brattleboro and am pleased to find that Flat Street has been cleaned up and the Latchis looks like it is about to reopen (maybe it already has?). My favorite restaurant – the Flat Street Pub – is still closed, however. I’m back at the house by 6:30 – in time to talk with The Boy before bed. The only beer in the fridge is a Heineken left over from somewhere, but even cheap beer tastes really good after a long day of travel and ‘real’ work.

Next week I’ll be up for another day trip, still trying to finish the punch list before winter sets in…

Tuesday, September 20, 2011

All's Quiet on the Cabin Building Front

When we began this project, The Boy was 2 and his needs - while continual - were at least restricted to the home. He was, in a word, ‘portable’, and went where we went, when we wanted to go.

And so we dreamed of monthly long weekends at the cabin, facilitated by my generous vacation days and the LSW’s from-home freelancing career.

What we forgot, of course, was that The Boy would soon become encumbered by interests and activities generated by:
• Him – “I don’t want to go to the cabin – there’s nothing to do there”
• Society – Insofar as absence from school is ‘truancy’
• Us – We’ve become the parents we formerly scoffed at, enrolling him in Soccer, Karate, Religious Education, etc, and ourselves in the PTA, Father’s Club, etc.

So when, exactly, do we get to escape to Shangri-La? July and August, apparently. A shame as we love VT most in the fall. The best I’ve been able to do this year is 2 weekends prior to Thanksgiving for the whole family, and 2 overnights for me. My original goal was to have all of the insulation in and the wall board up this year, but it’s starting to look like the cathedral ceiling and basement insulation will have to wait until next year. I should be able to get all of the wall insulation and wall board up, however.

Since the last post, there was a single trip up the day after the Hurricane. As the LSW noted in the previous post, VT was hit pretty hard by flooding – apparently the result of the land being pretty much water saturated before Irene came a-callin’. The cabin was apparently untouched except for having no power, but the towns around it got hit pretty hard. The major roads in from the North and West were effectively impassable, and my route from the South involved at least one significant detour. I arrived at 3PM, checked the cabin inside and out, breathed a sigh of relief, and headed back south for dinner.

We were lucky, and our thoughts are with many of our neighbors up there as they rebuild.

Tuesday, August 30, 2011

Hurricane Irene update

LSW here. As you might've heard on the news, Vermont got a surprise wallop from Hurricane Irene. We expected the worst in Connecticut, so we were prepared with lots of water, food and candles, but no one ever suspected that Vermont would take a hit. We're very lucky-- the cabin is fine. Unfortunately, some of the neighboring towns didn't fare so well. Our hearts go out to the residents of Grafton, Saxtons River, Brattleboro and all the other towns that are now faced with having to recover from the damage incurred by the overflowing river. No doubt it's going to be a long, hard road from here on out.

Tuesday, August 9, 2011

We are FUN.

LSW here with the Top Ten Most Awesome Sauce Things About This Past Weekend in Shangri-La.

1) I forgot to pack The Boy's suitcase. Fun! Where do people go to shop for clothes in our little paradise? I have no idea. I drove 1 1/2 hours to the nearest Walmart.

2) Despite the fact that our "kitchen" consists of a toaster oven , a coffee maker and an electric griddle set over a couple of boards across some sawhorses, it's still nicer than my "real" kitchen at home.


3) There is nothing, I mean nothing, more exciting than styrofoam. (And clean underwear.)


4) Except maybe Battleship. Hours and hours of Battleship. 


 5) Sandwiches, but they're not on bread. They're on pretzels. Pretzels!


 6) We like to include an educational element to our weekends in Shangri-La.
 

 ("The otter die cuss it smoket to much" and "He done got shot." Can't make this stuff up, folks.)

7) Road eggs. So charming, so quaint. Until you accidentally stick a $10 bill instead of a $1 into the locked cash box.  


8) Beer. Called The Vermonster.

9) Fireworks in the pouring rain.
10) Clear water!

Monday, August 8, 2011

Nothing is Ever Quite Done


 Looking around this weekend I was struck again with how nothing ever seems to quite get finished.
  • The siding is done, but the eaves still need to be boxed in.
  • The plumbing is done except for the hose spigot and the bathroom vanity.
  • The landscaping is done except for the driveway surfacing.
  • The electrical is done, except for the track lighting, the ceiling fan and the exterior outlets.
  • And rewiring the porch lights.
  • And installing the bathroom light/exhaust unit.
And so it goes - a growing punch list that I’ll get to ‘next time’.

Then there is the unexpected re-work ; month I noticed that one of the porch posts - comprised of 4 glued-up pieces - had a couple of small seam splits about ½ way up one side. This last weekend there were similar splits on the center column and additional splits on the first column. What gives? Could a 6x14 porch roof really exceed the combined 7500 lbs the posts are rated for? Or is it a manufacturing defect? I’ll continue to watch them, but they’ll probably get replaced with solid 6x6 posts (with a little decorative embellishing) before the winter snows add to the load this year.

And the regular work continues. There was some additional taping and sanding in the bathroom, but most of the weekend was given to insulation and sheet rock. My father hung the first 6 sheets of wall board in the dining/kitchen space, so this was my first experience with gypsum board. Turns out its messy, fairly easy, and very gratifying. Like framing, the changes are dramatic and the clear evidence of progress kinda propels you along.

The tools are simple, too: Saw horses, tape measure, chalk line, pencil, utility knife, wall board saw and cordless drill.  Put a sheet on the saw horses, measure and mark it for pesky obstacles (like windows door), cut one direction with the saw, score the other with the utility knife, snap the sheet at the score and cut the opposite side with the knife.

Easy, right?

Until you discover that you cut everything ‘mirror image’ so the backside faces outward. Or that you measured the distance to the window from the wrong side of the sheet. Or you go to lift the sheet up without adequate support and break it. Or you don’t support a ‘snapped’ piece adequately while cutting it and rip the paper on the reverse side. Or you lay the piece up on the wall only to find that your framing apparently isn’t 2’ on center after all.  (How did that happen??)

Fortunately, my father had clued me into some of these pitfalls previously, so I only ruined one of the 8 sheets we ultimately put up. Another reminder he provided: Keep the factory edges where sheets meet - there is a ‘valley’ toward the edges that is designed to keep the seams level and invisible. If you must cut a factory edge, do it on an inside or outside corner, or against a door or window where it will be covered by trim work.

Really, though - this is up there with tiling as a job too easy to ever contract for again. Taping, maybe; putting the wall board up - no way.

On the walls, anyway. I suspect that the ceiling would be more of a trick, but we‘re using tongue-and-groove pine, so we‘ll never find out.

So now each downstairs wall is mostly done, as running out of insulation and the need for final wiring work prevented us from finishing the job. One more thing for the list of ‘next times’…