Last night marked the first construction milestone: I cut the last check for the concrete work: $1,191.60, bringing the total to approximately $5,950. This was about $350 more than the estimate, but you may recall that I was warned in advance we might go over by 300 – 500 due to the slope of the land. The contractor was Charlie Record (Record Concrete of Chester, VT), and I’d recommend him without hesitation.
What would I do differently on the foundation the next time? Nothing, fortunately, and that surprises me. I’ve heard enough horror stories about contractors that I have to admit I expected to have at least small problems with anyone I hired. The fact that both the concrete and excavating work has been quick, professional and good quality has been encouraging. Of course, the fact that I researched the work up front, asked a million questions, and went in with a good idea of what I wanted probably helped. Here’s where experience as a business analyst and project manager pays off outside of work.
So far, at least.
Next up: Floor framing. After reading up and consulting a number of Internet Joist Span Calculators (including this one), I called Lavalley Building Supply expecting to order 2 x 10 x 16 Douglas Fir joists that I would space at 12” on center. And here’s where one of those pesky assumptions jumped up and bit me:
Salesman: What’s the span?
Me: 16 feet.
Salesman: You sure you want 2 x 10? Most people want 2 x 12 for 16 feet.
Me: The joist calculators I’ve been using say that Douglas fir should be good for 16.
Salesman: Oh – Doug Fir – yeah that would probably work. But we don’t have it – we’ve got spruce.
Me: Uh..
I told him I’d call back. After some research and a few questions, I determined that the framing lumber they had was lumped into a category that some calculators call ‘SPF’ – Spruce / Pine / Fir – which can be either northern (Lavalley’s was from Canada, eh?), or southern. It looked like I could still span 16’ with SPF 2 x 10s, but I was troubled by the comment that ‘most people want 2 x 12 for 16 feet’. The difference in price was about $9.50 vs. $16.50. My options:
1) Put in a beam and lally posts at 8’, and cut my span in half. This would be more work, but would allow me to use smaller joists.
2) Take Lavalley’s advice and go with 2 x 12s, which – according to the span calculators – should be much more than adequate. These would be heavier to work with and more expensive.
3) Take a chance on 2 x 10s, and insert a beam later if they proved inadequate.
What’s at stake? ‘Deflection’, apparently – the amount of flex or ‘sponginess’ in the floor. Apparently, we’re most comfortable with a deflection of about 1/2”; less and the floor is uncomfortably hard, more and there is too much bounce, causing the plates in your hutch to rattle when anyone moves.
In the end, I compromised by going with the 2 x 12s, spacing them 16” on center (which is standard) instead of 12”. This allowed me to reduce the number, saving a little work and minimizing the cost increase. The floor would have probably been fine with 2 x 10s at 12” oc, but the $200 savings wasn’t quite enough to risk it. And who am I to argue with experience?
Delivery is tomorrow, and we'll have about 14 hours to lay the sills, frame the floor, lay the decking, and then cover it with plastic until the next visit. Now the real fun begins!
A middle-aged corporate everyman struggles to realize his dreams of a place in the country
Shangri La
Showing posts with label Foundation. Show all posts
Showing posts with label Foundation. Show all posts
Friday, June 12, 2009
Tuesday, June 9, 2009
Countdown to Phase Two
Once again last week I traded 6 hours in the truck for 1 hour on site. Remember my previous post about assuming nothing? Well I realized after our last trip that I hadn't verified the width of the walls, the size of the cellar hatch opening, the distance from the slab to the beam, etc. So, tape measure in hand, I left the house at 6:30 AM.
At least it was a nice day for a drive - sunny and about 75 - and, being Saturday, relatively light traffic. I arrived on site to find that the Excavator had completed the back-filling, removed the last tree that would block the drilling rig's access to the well site, and cleared the short stretch of brush to the nearest CVPS pole.
God this guy did a nice job. He worked a miracle on my (formerly) sloped property, and left me with a rock retaining wall to support the driveway and a nice rock border on the up-slope side of the driveway that tied into the wall we cut the driveway through. The septic job is his next year if he wants it.
I was surprised to find that the electrician had already put up the board for the temporary power, but disappointed to see that CVPS hadn't yet hooked it up. In a call to CVPS yesterday, they said the weather has been lousy and they hoped to have it in place next week - not good as we're supposed to begin building the floor this weekend. That will add 2 day's rental of a generator to my costs - about $120.
Turned out that the measurements were different from my assumptions, but not enough to have been fatal. No fox sightings this time, but I was visited by a bright yellow bird with black wings that I've never seen in the 'burbs.
Next weekend begins 'Phase Two'. Our goal: Lay down the sills and get the floor framed in preparation for help from my sister's family a the end of June.
At least it was a nice day for a drive - sunny and about 75 - and, being Saturday, relatively light traffic. I arrived on site to find that the Excavator had completed the back-filling, removed the last tree that would block the drilling rig's access to the well site, and cleared the short stretch of brush to the nearest CVPS pole.
God this guy did a nice job. He worked a miracle on my (formerly) sloped property, and left me with a rock retaining wall to support the driveway and a nice rock border on the up-slope side of the driveway that tied into the wall we cut the driveway through. The septic job is his next year if he wants it.
I was surprised to find that the electrician had already put up the board for the temporary power, but disappointed to see that CVPS hadn't yet hooked it up. In a call to CVPS yesterday, they said the weather has been lousy and they hoped to have it in place next week - not good as we're supposed to begin building the floor this weekend. That will add 2 day's rental of a generator to my costs - about $120.
Turned out that the measurements were different from my assumptions, but not enough to have been fatal. No fox sightings this time, but I was visited by a bright yellow bird with black wings that I've never seen in the 'burbs.
Next weekend begins 'Phase Two'. Our goal: Lay down the sills and get the floor framed in preparation for help from my sister's family a the end of June.
Labels:
CVPS,
Electrical,
Foundation,
Land Preparation
Sunday, May 31, 2009
The Impending Construction

Driving to the Home Depot yesterday, I thought I had a revelation: Build the floor, cover it in plastic, and put in the well, and bank the remainder for the septic system after the 'supplemental' test next April. My thinking: The well and septic are the 'big ticket' items; the cabin can be built as money allows. And a site with well, septic and foundation would maximize my resale should I have to sell before being able to build the cabin. On the way home, however, I realized the that what I was really looking to do was find a way to escape the occasionally overwhelming logistics and anxieties that come with building a house, even if it is only a 'cabin'.
Here's the thing: I'm down to about $13,000, and I still have structure, well and cabin to go. The well will likely cost about $5,000, the septic about $6,000, the cabin shell about $10,000, and finishing about $10,000. My usual annual bonus, though modest, would have been a big help, but the recession/depression has ensured that I'm unlikely to see it again until - what? - 2011?
Installing well and septic with the money might ensure the best resale, but we can't envision a scenario in which we'd sell, so who cares? And is it really feasible to build the cabin 'as money allows'? What good is a floor and two walls, or even 4 walls and a loft? And so we come back to the original plan: Build a simple, lockable shell this year, and bank anything left over for septic next year. At least with a shell we have a place to 'camp', even if we're carting in our own water and using a mulching toilet. We've got a place we can use, if only for weekends. And a place we can stay while we're working on the rest.
The LSW has already reported on the foundation sealing work last weekend. (And how she got lost and found herself with a speeding warning while I paced the streets of Saxton's River wondering where the Dickens she was. With no cell service around Shangri-La, I couldn't just call her and ask.) I'm currently waiting for the excavator to let me know that backfilling is complete and the path to the nearest CVPS pole is cleared so I can get temporary power installed. Our hope is to do an overnight on June 13th to both install the sills and attend the meetinghouse fundraiser that Saturday. My sister and her family are planning on camping with us on June 27 to begin the construction proper, so things are going to start moving quick.
To do:
1) Finalize the plans and place an order with the local lumberyard
2) Install the sills
3) Contact the electrician to get temporary power service installed
4) Contact CVPS to let them know the pole can be replaced and temporary power hooked up
5) Make reservations at the local campground for June 27th and July 4th
6) Dig out the camping equipment and see what we're missing (its been a long time since we camped!)
For those of you keeping score, the foundation sealant was a petroleum-based, fibered foundation/roofing tar that came in 5 gallon containers from my local Lowe's for about $35 each. We went to Shangri-La with 20 gallons, but only needed 10 for two coats. Each coat took about 4 hours, and it was a mess despite our best attempts to be careful. Here's a few more pics from the foundation sealing weekend:

PS: The change in management at the Saxton's River Inn has had generally positive results: I felt that the food was just as good, while the LSW thought that it had gone just slightly down-hill. The breakfast offerings - though still limited - were about 50% better, however, so overall we were satisfied that it would remain one of our favorite New England Inns.
Saturday, May 30, 2009
What in tarnation?
LSW here.
Last weekend marked the opening season of Cabin Building 101, as evidenced by this:
That's the warning I got from the kind officer who pulled me over for doing 47 in a 35 m.p.h. zone. This, after a long day of painting tar on the foundation, then getting lost for two hours in God's Country with the Boy who was saying, "I just want dinner!" By the time the officer got to my car door, I was in tears. Anyhow, all turned out well, as evidenced by this:
Two coats of tar on the foundation. Yep. That's me, in the trenches, literally and figuratively. Now the real fun begins. I looked at the calendar today and realized that we will be in Vermont for the next five weekends, only from now on we'll be camping. I'm trying to be very zen about it. Breathe in, breathe out. It's kind of overwhelming. But then I get to thinking of all the times I'll be able to say, "Hey girls, let's ditch the husbands this weekend and go up to Shangri-La," and it suddenly seems all worth it.
The Vermonster will be posting with some real details shortly.
Last weekend marked the opening season of Cabin Building 101, as evidenced by this:
That's the warning I got from the kind officer who pulled me over for doing 47 in a 35 m.p.h. zone. This, after a long day of painting tar on the foundation, then getting lost for two hours in God's Country with the Boy who was saying, "I just want dinner!" By the time the officer got to my car door, I was in tears. Anyhow, all turned out well, as evidenced by this:
Two coats of tar on the foundation. Yep. That's me, in the trenches, literally and figuratively. Now the real fun begins. I looked at the calendar today and realized that we will be in Vermont for the next five weekends, only from now on we'll be camping. I'm trying to be very zen about it. Breathe in, breathe out. It's kind of overwhelming. But then I get to thinking of all the times I'll be able to say, "Hey girls, let's ditch the husbands this weekend and go up to Shangri-La," and it suddenly seems all worth it. The Vermonster will be posting with some real details shortly.
Monday, May 18, 2009
On Foxes and Porches

Last week the excavator asked me whether or not I wanted him to seal the foundation. With my dwindling bank account in mind, I decided it was time to get some skin in the game. Apparently I would need to break of the form ties with a hammer, fill in the holes with roofing tar, and cover the exterior with sealant up to ground level. Easy enough.
And so it was that I pulled onto the site Sunday morning and was struck by the fact that construction had, in fact, begun. The presence of the foundation transformed the lot and made it, for the first time, very easy to see how our little cabin (and we) would actually inhabit the land. Over the next couple of hours, I found myself again rethinking the design.
We originally wanted the cabin to ‘face’ south, into the land, with a full-width porch that would look down the slope toward the leech field. This presented a couple of problems, though:
1) There would be no ‘face’ to present to the road and driveway. It doesn’t sound like a big deal, but houses always seem more welcoming when they face you as you approach them. A house presenting its back seems to say ‘go away’. (I’m curmudgeonly enough to prefer that most people actually stay away, but it would be nice if the house would welcome me when I arrive.)
2) Given that the south side would not be on a gable end, I had (for a number of reasons), decided that I would need 10’ walls on which to secure the porch roof. It was now apparent, however, that that the foundation would rise 4’ about the ground on the south side given the slope of the land. This would mean 14’ to the cap plates, which was higher than I’d prefer to work, given the 12/12 roof pitch and the fact that I myself am well short of 6’. Furthermore, building the deck would be more complicated as it would range from 4 – 6’ off the ground as the land sloped away.
It occurred to me that I could solve both problems and simplify construction by opting instead for two 12’ porches, one on the east side facing the driveway, and one on the west side letting out from the kitchen. Using the gable ends of the house meant that I could revert to 8’ walls, and both porches would give us better access to the leveled portion of the property that wraps around the north and west of the cabin.
When I look back at my sketches over the last few months, it’s interesting to see that what began as a simple 14x24 box kept growing and becoming more complicated, eventually bulking up to 20x30 and sporting a tower facing the road. Once the actual work began, however, the sketches get smaller and simpler as I begin working out the logistics of actually building the thing.
“We only need something like a hotel room with a kitchenette,” the LSW kept saying. “We can add to it later. And she’s right. The simpler it is, the better chance for success.
I hammered off most of the form ties, which – true to form – took longer than expected, and decided to wait until next weekend on the roofing tar. I still needed to check out 3 local campgrounds, and I wanted to get home in time to relax a little before the work week began again. Just before I left, however, a fox emerged from the woods and we stood for a few minutes looking at each other before he casually trotted back into the underbrush. Probably a common site to the residents of Shangri-La, but rare enough to feel a bit magical to those of us trapped in the ‘burbs. I wonder how the Boy would have reacted?
PS: Interim bill for the foundation work - $1967.50 with the rat slab still to go.
Friday, May 8, 2009
Prelude to a Cabin
Spent most of last Saturday in the truck, making the 6 hour round-trip to Shangri-la for a final inspection of the site before the trenches are dug for the foundation. It was 'green up VT' day, and everywhere I looked families were picking up roadside garbage (precious little, compared to CT) and stuffing it into green bags. Those who weren't seemed to be fly-fishing in the West River. I love this place.
On site, the leaves were just emerging, as were the bugs. I stayed for about a half hour before the swarm reached critical mass and chased me back into the truck. The excavator did a pretty good job leveling the land; the only change I made was moving the foundation markers 10' to the east to get a clear line of sight from the gable end to the nearest CVPS pole without having to take down a 50' pine.
On site, the leaves were just emerging, as were the bugs. I stayed for about a half hour before the swarm reached critical mass and chased me back into the truck. The excavator did a pretty good job leveling the land; the only change I made was moving the foundation markers 10' to the east to get a clear line of sight from the gable end to the nearest CVPS pole without having to take down a 50' pine.
Monday, April 27, 2009
Concrete Plans

My excavator called me last night from Orlando to let me know that the site had been graded if I wanted to take a final look before the foundation trenches were dug. I was impressed that he’d take time out from his vacation update me – my experience with contractors being more on the give-them-a-deposit-pray-they-get-around-to-it-this-year end of the spectrum.
When I met with him and the concrete guy 2 Saturdays ago, it was agreed that the foundation could go in right after May 15th – the date they lift the mud season heavy load restriction on Shangri-La’s roads. (The town only has 2 paved roads – the only two that don’t dead-end – and even they have dirt sections.) The concrete work would take 3 days, and a week or two to cure after that, setting my start date in early June.
That Saturday was also the first time the project began to feel a little intimidating. Standing in the center of this denuded patch of forest I was struck that I would have to actually construct a building here – possibly by myself – before the first frost. It suddenly seemed a tall order.
A few random notes from the last two weeks:
The cabin plans have always called for a porch, and it occurred to me that the right time to pour the footings is while the foundation is being done. My plans call for 5 piers for the front porch, and 2 piers for the back; the excavator agreed to do the work on a per hour basis – at $45, expecting about a ½ day’s work. He also agreed to pick up the sonitubes and footing forms. The concrete guy expected to have enough concrete in the truck to pour them, so he thought the charge would be minimal if anything at all. I may not build the porches this year, but at least we’ll be ready for them.
I met with the CVPS guy on the same day, and we talked about plans for underground service to the house. Turns out that the $35/foot I quoted here was specifically for underground service. If I went overhead, the charge would be less, involving only wire, the weather head and the meter – no pole needed if the gable end of the house was less than 125’ from the pole. (I should just squeak by on that one.) This option does mean that I’ll need temporary power, however, which will be an $80 setup charge plus the cost of an electrician.
The excavator noted that he saved the stone from the wall so he could put it back in place once the width and location of the driveway had been finalized. This wasn’t something I expected, and one more reason why I’d recommend this guy to anyone. Not only was he less expensive than the others, but he seems to take a lot of pride in his work. And a hell of a nice guy.
The concrete guy had quoted me about 5,200 over the phone based upon a level site. He spent almost an hour brainstorming with the excavator on how they could carve a roughly level area out of the 15% slope we had to work with. In the end, he noted that the price could go up by a couple hundred dollars if the forms need to be stepped. This was still significantly cheaper than the next bid, so I’m not concerned.
With the land cleared, we’re now in clear view of the neighbors across the street. Not terrible, but I preferred the out-in-the-woods feeling. We’ll need to do some landscaping eventually the reclaim some of the privacy. On the other hand, the new sight lines should deter any vandalism, so I’ll have to think about this.
Financial tally: $1,000 to the excavator for the balance of the land clearing, and $1,000 deposit on the grading and excavating. Last week I got the formal proposal from the concrete guy, and cut another check for half of the foundation work - $2,600.
When I met with him and the concrete guy 2 Saturdays ago, it was agreed that the foundation could go in right after May 15th – the date they lift the mud season heavy load restriction on Shangri-La’s roads. (The town only has 2 paved roads – the only two that don’t dead-end – and even they have dirt sections.) The concrete work would take 3 days, and a week or two to cure after that, setting my start date in early June.
That Saturday was also the first time the project began to feel a little intimidating. Standing in the center of this denuded patch of forest I was struck that I would have to actually construct a building here – possibly by myself – before the first frost. It suddenly seemed a tall order.
A few random notes from the last two weeks:
The cabin plans have always called for a porch, and it occurred to me that the right time to pour the footings is while the foundation is being done. My plans call for 5 piers for the front porch, and 2 piers for the back; the excavator agreed to do the work on a per hour basis – at $45, expecting about a ½ day’s work. He also agreed to pick up the sonitubes and footing forms. The concrete guy expected to have enough concrete in the truck to pour them, so he thought the charge would be minimal if anything at all. I may not build the porches this year, but at least we’ll be ready for them.
I met with the CVPS guy on the same day, and we talked about plans for underground service to the house. Turns out that the $35/foot I quoted here was specifically for underground service. If I went overhead, the charge would be less, involving only wire, the weather head and the meter – no pole needed if the gable end of the house was less than 125’ from the pole. (I should just squeak by on that one.) This option does mean that I’ll need temporary power, however, which will be an $80 setup charge plus the cost of an electrician.
The excavator noted that he saved the stone from the wall so he could put it back in place once the width and location of the driveway had been finalized. This wasn’t something I expected, and one more reason why I’d recommend this guy to anyone. Not only was he less expensive than the others, but he seems to take a lot of pride in his work. And a hell of a nice guy.
The concrete guy had quoted me about 5,200 over the phone based upon a level site. He spent almost an hour brainstorming with the excavator on how they could carve a roughly level area out of the 15% slope we had to work with. In the end, he noted that the price could go up by a couple hundred dollars if the forms need to be stepped. This was still significantly cheaper than the next bid, so I’m not concerned.
With the land cleared, we’re now in clear view of the neighbors across the street. Not terrible, but I preferred the out-in-the-woods feeling. We’ll need to do some landscaping eventually the reclaim some of the privacy. On the other hand, the new sight lines should deter any vandalism, so I’ll have to think about this.
Financial tally: $1,000 to the excavator for the balance of the land clearing, and $1,000 deposit on the grading and excavating. Last week I got the formal proposal from the concrete guy, and cut another check for half of the foundation work - $2,600.
Saturday, April 11, 2009
And We're Off!

The bids have been rolling in over the last 2 weeks. Here’s the score:
Land Clearing:
Way back in November, I got a land-clearing estimate of $3,500 to $5,000 per acre via phone, but didn’t actually meet anyone on-site until 2 Saturdays ago. Over the course of an afternoon, I met with 3 excavators and gained the following info:
- 3 of the 40 – 60’ pine trees near the foundation should be pulled down or I’ll risk obliterating The Dream during a wind or ice storm. A 30’ pine fallen over the well site since the last visit was all the evidence I needed.
- Most of the remaining trees were small (less than 8” in diameter, and would be pretty easy to clear.
- The land is sloped at 15-20 degrees, and it will have to be cut back significantly to ensure the water drains away from the foundation.
- The grading of the driveway will need to be continued to the well site so the drilling rig can get to it and level itself. The land can be returned to it’s original slope after drilling is done.
- One of the contractors lived in the neighborhood, and he suggested a small culvert to channel water under the driveway where is meets the road. “There’s a lot of run off on this road during a storm.”
- Another contractor noted that I might need a ‘cut approval’ from the down to join the driveway to the road. A quick check with the road commissioner confirmed that there was no such requirement in Shangri-La. This place is a libertarian paradise.
- If the stumps can be buried on the property, it will be cheaper. As soon as they leave the property, they become garbage and must be disposed ‘appropriately’ – which will cost.
- Final finishing of the driveway should wait until both the foundation and septic work is done, due to the size of the equipment that will be on the property. Until then , the drive can be surface with rough stone.
Estimates? Low of $2,000 from the neighbor, mid of $2,810, and high of $4,500 (from someone who obviously thinks that ‘from Connecticut’ means monied and stupid). All estimates included the crushed stone for the driveway.
The neighbor - who does excavating as a second business - got the job last Wednesday, and the land was cleared by Sunday. We’re heading back up next weekend to see the work and settle up.
Excavating:
I didn’t realize when I started this that excavating and foundation-pouring were separate activities, but apparently they are. The concrete guys I talked to all had excavators they work with. Consequently, I had no line item in the budget for excavating. Oops. The same guys bidding on the land clearing also bid on the excavating, and the scores were similar: $2,000 from the neighbor, a little more from the middle guy, and another $4,500 for the one who mistakes me for a [former] derivatives broker. All included trenches for the forms, preparation for the rat slab, installation of foundation drainage pipe, installation of pipe/conduit for power and septic (to 10’ beyond the foundation), and backfilling.
I’m planning on giving the job to the neighbor, but I’ll wait until I see his land clearing work next weekend.
Foundation:
The foundation is going to be a simple 16’ x 28’ crawlspace with a “rat slab”. The footings will be laid at 4’ below grade (to prevent frost-heave), and will be topped with 8” wide walls. There will be two vents and a 4’ access opening. All concrete will be rated at 3,000 lbs, and the work will take 3 days.
In this case, the low bid also came from my neighbor: $2,200. This from a contact of his in the neighboring town who does concrete work ‘on the side’. This sounded good until the next two estimates came in: $5,160 and $5,800. Some further research revealed the concrete cost alone to be about 2,100, never mind the rebar, bolts, oil for the forms, labor, and rat slab mesh. Suddenly the low guy was suspect, and I reverted to a piece of advice I’ve heard over and over again: Be cautious of the lowest and highest bids. Today I confirmed with the $5,160 guy, who also agreed to throw in the concrete for 7 frost-line piers for a deck, given that there will probably be more on the truck than he’ll actually need.
Total anticipated bill for land clearing and foundation: $9,160 – about $4,000 more than I budgeted for. Say it with me: Twice as expensive as you expected, and three times as long.
Monday, March 30, 2009
Spring Fever
Lured by the Saxtons River Inn's 2-for-1 offer through March 31, we packed up the car and headed for Shangri-La this last weekend. Me, the LSW and The Boy were joined by The Niece (who has been crashing at our place over the last year while attending a local college) and the LSW's sister, who was looking for an excuse to spend a few days exploring a new place and sleeping late. My goal was to meet with 3 excavating and concrete contractors to get the ball rolling on The Dream.
But first things first: The food.
Dinner at the Saxtons River Inn is still outstanding - especially the crispy onion rings, fish and fries. The LSW and her sister were united on the virtues of the pulled pork and the burger, respectively, but The Niece apparently prefers soggy french fries to crispy ones, so she was less enthused.
Unfortunately, the Inn falls short in the breakfast category - providing only coffee, apple juice, store danish, apples and oranges. Luckily, The Golden Egg is only a block away and offers the second-best breakfast in New England (the first being King's in Newtown, CT). I recommend the Vermonter Skillet if you're going, or perhaps the blueberry crepes. The breakfast sandwich was also good, but the fact that they don't offer it with Vermont cheddar is almost unforgivable.
On Saturday evening, we descended upon the Putney Diner to sample their pies on the recommendation of Mr and Mrs Chops. In the spirit of adventure, I ordered a Reuben for the first time in my life. Good choice, that; I've got a new favorite sandwich. The cole slaw was fresh and the pickles agreeably sour, but the fries were soggy, to my dismay and The Niece's delight. The 4 of us split 3 slices of pie at the end of the meal - Apple, Chocolate Cream and Maple Walnut. The verdict: The apple wasn't as good as the LSW's, but the Maple Walnut and Chocolate Cream were worth the trip.
The LSW will be reporting on the handmade chocolates she tracked down in Walpole, NH here. Ye gods, they are good! And then there was 'Smokin' Bowls' on 123 between Bellows Falls and Chester:

Does this look good or what? We ordered the 'Brownie of the day'; tasty but - unfortunately - strictly legal.
Now, down to business:
As I noted, the reason for the trip was to get land clearing, excavating, and foundation estimates. To that end, I spent all of Friday afternoon and part of Saturday morning on site, taking time to walk the property and clearing some of the underbrush between appointments. The weather was in the mid-50's and the sun shining, and I spent most of the day in a T-shirt. Nice.
I started by locating the engineer's markers, which was a little challenging as a fallen pine took out the well marker. Once I found it, I was able to triangulate the planned position of the cabin and mark it with orange poles. The slope of the land seemed to lend itself to a walk-out basement, and before I knew it I was getting estimates on one at 28 x 32 in addition to my less ambitious 16 x 28 crawl space.
I talked with 6 contractors in total. Some things I learned:
The 'official' estimates are all expected before the end of this week, so I anticipate we'll be underway within a month. The first step will be land clearing, which is expected to take about 2-days, as most of the trees on the site are relatively small.
Here's a shot of the building site:

The view behind the future cabin:

In this shot the two large boulders mark the future driveway:

Incidentally, the major lesson learned on this trip was that a Hyundai Sonata is not the best vehicle with which to sample dirt-surfaced mountain passes during mud season. I see a Subaru in the LSW's future...
But first things first: The food.
Dinner at the Saxtons River Inn is still outstanding - especially the crispy onion rings, fish and fries. The LSW and her sister were united on the virtues of the pulled pork and the burger, respectively, but The Niece apparently prefers soggy french fries to crispy ones, so she was less enthused.
Unfortunately, the Inn falls short in the breakfast category - providing only coffee, apple juice, store danish, apples and oranges. Luckily, The Golden Egg is only a block away and offers the second-best breakfast in New England (the first being King's in Newtown, CT). I recommend the Vermonter Skillet if you're going, or perhaps the blueberry crepes. The breakfast sandwich was also good, but the fact that they don't offer it with Vermont cheddar is almost unforgivable.
On Saturday evening, we descended upon the Putney Diner to sample their pies on the recommendation of Mr and Mrs Chops. In the spirit of adventure, I ordered a Reuben for the first time in my life. Good choice, that; I've got a new favorite sandwich. The cole slaw was fresh and the pickles agreeably sour, but the fries were soggy, to my dismay and The Niece's delight. The 4 of us split 3 slices of pie at the end of the meal - Apple, Chocolate Cream and Maple Walnut. The verdict: The apple wasn't as good as the LSW's, but the Maple Walnut and Chocolate Cream were worth the trip.
The LSW will be reporting on the handmade chocolates she tracked down in Walpole, NH here. Ye gods, they are good! And then there was 'Smokin' Bowls' on 123 between Bellows Falls and Chester:

Does this look good or what? We ordered the 'Brownie of the day'; tasty but - unfortunately - strictly legal.
Now, down to business:
As I noted, the reason for the trip was to get land clearing, excavating, and foundation estimates. To that end, I spent all of Friday afternoon and part of Saturday morning on site, taking time to walk the property and clearing some of the underbrush between appointments. The weather was in the mid-50's and the sun shining, and I spent most of the day in a T-shirt. Nice.
I started by locating the engineer's markers, which was a little challenging as a fallen pine took out the well marker. Once I found it, I was able to triangulate the planned position of the cabin and mark it with orange poles. The slope of the land seemed to lend itself to a walk-out basement, and before I knew it I was getting estimates on one at 28 x 32 in addition to my less ambitious 16 x 28 crawl space.
I talked with 6 contractors in total. Some things I learned:
- When the land it cleared the excavator will expect to take away any salvageable wood. If you choose to keep it, the cost of the work will go up.
- The cost of land-clearing will go down if the stumps can be buried on the property. Brush will be burned if weather conditions permit, or chipped if not.
- Excavation will include digging the holes for the footings, leveling and prepping the floor for the rat slab, laying the drainage pipe, and back-filling and grading when the work is done.
- The excavator can also be expected to rough-in the septic pipe and a 4" PVC conduit for the well. He/She should also run both pipes 10' beyond the foundation to make sure you're not trying to dig into the stone that will be laid down over the drainage pipes.
- Well-drilling rigs require a roughly level surface and wide access to the well site.
- The driveway should only be roughed-in until the foundation is done. After that, it should be at least sub-surfaced until all of the work on the site is finished.
- Excavation and Land-Clearing estimates can vary significantly. Mine ran from a low of $4,000 to a high of $9,000.
- Pouring the foundation will need to wait until at least mid-May, when the prohibition against heavy trucks on most unpaved roads during 'mud season' is lifted.
- It will take 3 days to pour the foundation, and about a week for it to cure. Once it is in, the building needs to go up before winter to protect it.
- Foundation estimates seem to vary less than excavating. For a 16 x 28 frost-wall foundation including a rat slab, I'm apparently looking at between $5,000 - 6,000.
The 'official' estimates are all expected before the end of this week, so I anticipate we'll be underway within a month. The first step will be land clearing, which is expected to take about 2-days, as most of the trees on the site are relatively small.
Here's a shot of the building site:

The view behind the future cabin:

In this shot the two large boulders mark the future driveway:

Incidentally, the major lesson learned on this trip was that a Hyundai Sonata is not the best vehicle with which to sample dirt-surfaced mountain passes during mud season. I see a Subaru in the LSW's future...