I am the Walrus

LSW here. Time for a little lightening up, wouldn't you say? The Vermonster has been busy brainstorming solutions for a few weeks now, but I think we've got it all figured out. We've organized the items in, what I believe, is a manageable and less stressful punch list. Now we can kind of take it easy, actually.
On our last trip to Shangri-La, we came upon several wonderful sites. This:
and this:Oh no, sorry. That's from the Museum of Natural History in New York. But we did discover wild strawberries growing on our property!
Now allow me to get a bit philosophical here for a moment. When we started this project, I wasn't so sure that it was a wise decision. After all, we're two people with no building experience, and one of us is clueless when it comes to things mechanical. One of us is also very clumsy, so it didn't really seem like the smartest thing to do. But I will admit (just don't tell the Vermonster), that this has been quite a learning experience for me. Today while I was at the gym, I actually chose to watch HGTV over the Food Network. They were re-doing a backyard and building a Japanese pagoda/deck. The host asked the owner of the house, "Have you ever used a nail gun?" The big, burly guy said, "No," and I was like, "What? Come on, wuss!" Because, you see, I believe that once you've used a Paslode, you can do almost anything.
Now I can change the belts in the vacuum cleaner. I can take the grill apart to clean it. And you know what? I even know what a fuse box is for. I may not have been able to light up a dollhouse in 7th grade science class, but check me out now, Mr. Vince! I can wire up a cabin for a microwave, stove and lights while simultaneously entertaining a 4-year-old. So while logistics like septic vs. well plague the Vermonster at night, I've been going to sleep feeling like Wonder Woman.

Monday, June 22, 2009

Framing the Floor


As the LSW reported, we made significant progress last week. We began work at noon on Saturday, and – despite rain and drizzle Sunday morning - managed to get 90% of the floor done by Sunday at 3. I drove back up by myself on Wednesday to finish the job.

My notes from this effort:

The wood was delivered wrapped in metal strapping. I figured there must be some way to remove it without a metal cutter (one of the few things I didn't bring), but I’ll be damned if I could figure it out. In the end we had to shimmy the first piece in each bundle out to loosen the tension and get the rest free. Next time, I’ll bring metal snips.

The top of the foundation looked more level than it actually was. The sills bolted down tight, but after the floor and face joists were in place, I was left with 1/8" to 1/4" gaps in the northeast and northwest corners. I began to shim them, but decided to wait until the walls and roof were up to see if the weight of the whole structure closed them.

I didn’t think to check how the metal bridging – which is sold flat – actually gets installed. My intention had been to install two rows, each about 5’ in from the face joists. I ended up bending the first row into a ‘z’ shape and nailing them to the inside faces of each joist. Something about this didn’t seem right to me, but I went from one end of the building to the other anyway. When I got home and looked it up, I saw that each end should be nailed to the top and bottom of adjacent joists, and felt like an idiot. After installing a row correctly on Wednesday, I considered ripping out first row, but decided to leave them in place so that the next owner can wonder what the hell I was thinking.

My new Paslode cordless pneumatic nailer performed flawlessly; it’s going to be worth its weight in gold.

On Wednesday, CVPS was on site swapping out the pole that is going to feed power to the house. I spent some time talking with the crew, and learned that the Advantek floor sheathing I was using is face-treated with water-proofing, so it should stand up to the elements until I have the roof on. I had hoped that they would hook up my temporary panel, but that, apparently, is a separate job. When I called CVPS on Monday, they expected to complete the job within a week.

After all of the sheathing was in place, I was in the crawlspace installing the bottom ends of the bridging and found myself looking repeatedly at the hatch. There is something about working in a space from which the is only one exit that is unnerving. Not that I expected a bear or the guys from ‘Deliverance’ to show up, but if they did…

The town was hosting a small tag sale and fair at the meetinghouse to raise money for it’s repair. The food was tasty and the folks were very nice. It was nice to see ‘Chris’ again, whom we had met previously at the bar of the Saxton’s River Inn. We also got to go into the meetinghouse for the first time to see first-hand that it needs a lot of work. It really does look like nothing has been done to it since 1817. We made a $50 donation, which I figured was the least we could do to preserve our view.

The LSW easily pulled her weight and made the job more enjoyable, and The Boy was well-behaved despite missing his nap and provided much-needed oversight from the sidelines.

Sadly, this was our last stay at the Saxton’s River Inn before the camping begins. Dinner again was excellent, and homemade donuts and pastries have been added to breakfast. I’ll miss the place – it feels like home at this point.