I'm taking a break from the usual manic Monday routine to do some work at the cabin. Up at 5, packed and on the road by 6:10. I’m thinking I’d like to see if Brattleboro has cleaned up since the Hurricane, but the traffic into town is significantly backed up and I hop right back onto the highway.

A few more exits up I find I’m able to travel the roads that were blocked during my last trip. There’s earth-moving equipment in many places along the river, apparently rebuilding the riverbanks at critical spots. There are two mobile homes that appear to be a total loss, one house that that is marginal, and a covered bridge that made it through but took some heavy damage. Pretty impressive from a ‘river’ that is usually 1 – 4 feet deep at most.

After a stop at the village store for a croissant and the local papers, I’m at the cabin by 9 AM. The leaves are already beginning to turn and the roads have a picturesque dusting of the ones that have already fallen. It would be the perfect fall day except that it’s a little too hot and already somewhat humid.

My goal is to complete the electrical and plumbing work – of which very little remains. The first task is to correct the dodgy job I did installing the front porch light – mounting the light to the wall and feeding the wires to a gang box facing the cabin interior. What was I thinking? Even the electrician left a note saying “uh, you might want to consider…” 15 minutes, a hole saw and an round gang box and I can hold my head up at an IBEW meeting again. Not that I'd know where to find one.

That fix was the only thing preventing me from finishing the downstairs insulation, however, so I decide to put it up now rather than waiting until the LSW and The Boy are with me. Insulation is deceptively nasty, and the less we work with it while we’re trying to enjoy the place the better. This leads to the first ‘son of a bitch!’ moment when I realize that the two rolls of R19 I bought were for 16” – rather than 24” – framing. How could I possibly have missed that? I knew they seemed like too much of a bargain when I bought them. I decide to make it work, however, and spend the next couple of hours finishing the downstairs insulation.

I consider turning back to the electrical after lunch, but the temptation to cover the insulation with dry wall is overwhelming and I give in. This leads to the second SOAB moment when I cut two leftover pieces of wall board only to find that they are both 1’ too short. Yes, Norm, I hear you: Measure TWICE, cut ONCE. Aggravating the situation, I find that I need to change the framing inside the closet to mount them. No surprise, as SOAB moments are invariable followed by ‘more work than expected’ experiences. The reframing I do here opens my eyes to 3 other minor framing tasks I’ve been stalling on, and I figure I might as well address them while the mitre saw is out and the Paslode is cooperating.

I use the two short pieces of drywall I’ve cut and patch in smaller pieces above. It’s the entry closest, and I reason that I’ll cover the seams with a shelf. I then put the remaining insulation in the loft, and – with my new framing-ray vision - realize I have additional framing to do on the gable walls in order to effectively mount both the wall board and pine ceiling. SOAB! (And MWTE.)

At this point it is 2:30, and I still have to unload the kitchen/entry tile backer boards from the truck and clean up before leaving, so I call it a day. Looking around, I feel like I got very little done. As always.

On the way back, I travel through Brattleboro and am pleased to find that Flat Street has been cleaned up and the Latchis looks like it is about to reopen (maybe it already has?). My favorite restaurant – the Flat Street Pub – is still closed, however. I’m back at the house by 6:30 – in time to talk with The Boy before bed. The only beer in the fridge is a Heineken left over from somewhere, but even cheap beer tastes really good after a long day of travel and ‘real’ work.

Next week I’ll be up for another day trip, still trying to finish the punch list before winter sets in…

Sunday, July 17, 2011

Mid-June and early July 2011

Having failed to achieve a working bath in May, we moved the goal-post to mid-July. This resulted in two interim trips - a weekend trip with the whole family in June and a day trip myself in July.

On the July trip, we celebrated the completion of the siding when my carved fleur-de-lis finally went up in the front gable. Nothing is without its trials however, and - after spending every night for a week carving it - I got a little too enthusiastic with the nail gun very nearly ruined it. After a temper tantrum and a shameful string of profanity, however, I had an idea and - voila! - all is well. (The carving was supposed to be both a nod to my ancestry and a way not to have to shingle the gable. For the latter: Mission Accomplished; for the former: We're a little concerned that people will think that it is a Boy Scout camp...)

C'est formidable!

And so the endless siding job comes to an end!

The other big achievement was all the LSW's - she grabbed the float and grouted all the tile. She then attacked the sheetrock taping. What a woman!



While she was at it, I got the plumbing to the point where only the tub spout and the exterior hose spigot remained. I also hooked up the first of the electric baseboard heat.

And VTel came around to hook up the phone, so now I can call 911 should I happen to nail my foot to the floor...

Finally - contact with the outside world.

We might have gotten ourselves to a working bath, but the LSW discovered that the annual Quechee Balloon Festival was Saturday and we couldn't resist the temptation. 




This, my friends, was worth the trip. Carnival atmosphere, local crafts, plenty of free food samples, plenty of stuff for The Boy, a beer garden, French-and-Indian War re-enactors(!), and lots of balloons.




There were about 30 of them, and the crowd was allowed to mill around the field as they were being inflated and launched - getting you right up close to the action. The boy loved it. We did, too. It is impossible not to be positively giddy when there are a boatload of balloons launching all around you.



Lodging for the weekend was at the Super 8 in Brattleboro courtesy of bargain prices the LSW found on the web. I would have liked to have stayed at the Saxtons River Inn again, but every dime in savings counts these days.

In early July, I was back up for a day trip. I had a long list of things to do, but in the end I managed only to seal the grout and hook up the remaining baseboard heaters. Hennessey Electric came in the following week to inspect my work and hook the the water heater and baseboard heat to the service panel. Done and done. The next trip, we'll be staying overnight...

Friday, December 24, 2010

Odds and Ends 2010

Happy holidays, everyone! (Or Merry Christmas/Happy New Year, if you prefer; I'm a practicing Buddhist, so I don't have a dog in the 'Christmas Wars' fight.) The holiday festivities in the Vermonster household began with a day trip to Shangri-La to make sure the cabin was still standing and that the crawlspace wasn't flooded. It was and wasn't, respectively. I drained the pressure tank last time we were up and shut off the pump, so there was nothing to freeze. I'm new to this game, though, so it seemed prudent to check.
 
Someday that Tyvek will finally be completely covered. Probably on the same day I finally haul away those pallets...
There was just a dusting of snow on the ground, and - with the exception of some new mouse droppings - everything was just as we left it. I took detailed measurements of the kitchen and bath for cabinets and fittings, and then an inventoried the remaining materials before locking up. It seemed a shame to drive all that way for 30 minutes' work, though, so I walked the perimeter of the property to stretch the time. Turns out I have parts from an old car on one end of the property, and some old cans and buckets on the other. Everything I found looked to be from the 30's or 40's, so at least it was 'historic' garbage. CVPS also cut a lot of hardwood installing the new poles in the right-of-way this year; I'll have to cut and stack it in the spring in preparation for the wood stove.
Looking over the posts to date, I found a few 'holes' in my documentation of this cabin-building journey. Here's a modest attempt to fill them:

Q: You spent a lot of time talking about prefab and kit options - any regrets not going that route?
A: Not really. During the research stage, they all seemed to be at least 1/3 more than framing the place myself. In the end, this was mitigated somewhat by paying a contractor to do the roof sheathing/shingles, and the additional time it took to do it all 'from scratch'. In the end, thought, I got valuable experience in framing that I can use for outbuildings and additions, the pride of saying we did it ourselves, and a little extra money to put toward finishing. As we're doing everything with cash, spending more up front to get the structure in place wouldn't have bought any time, as we would have just run out of money quicker and spent more time staring at the place rather than working on it.

Q: You neglected the blog through almost the entire framing process. What gives?
A: The framing work was intense and exhausting, and it was hard to spend time writing about it after 3-4 days of working. With the exception of the hipped porch roof, however, it really wasn't all that hard. Building the walls was relatively easy, and the sheathing was only difficult in that it was awkward to work with on ladders on the South side. The hardest thing about framing the roof was the sheathing and shingling - something that I would have done myself anyway had I not opted for a 45-degree angle. I knew very little about framing when I started, but two books gave me everything I needed:
  • The Ultimate Guide to House Framing by John D. Wagner
  • Working Alone: Tips and Techniques for Solo Building by John Carroll.
Q: When you were planning the electrical, did you consider going solar and staying 'off the grid'?
A: I did, but the fact that I had a CVPS pole less than 100' from the cabin made it just too easy to go conventional. Again - we're doing everything with cash, so a big outlay for solar now would just mean that the rest of the work gets done much later in the future, preventing us from actually using the place. My current plan is to add solar panels after we've finished to feed power back to CVPS. Vermont does net metering, so this should offset the cost of electrical significantly. Not quite 'off the grid', but arguably the next best thing. The other thing that worked against solar was the fact that it seemed to require a different well setup - low flow pump and underground storage reservoir - that would also make the well installation more expensive.

Q: No that the market has recovered, any regrets about cashing out the 401(k) during the panic?
A: Ah, yeah, well...you have to be philosophical about this kind of thing. The story I tell myself these days is that I converted a stock investment into a real estate investment. Yes, the cost of land and materials dropped in the same time frame, but the truth is that I still lost more by cashing out than I gained in lower prices. No one was sure what was going to happen in those dark, post-crash days, though, so I rolled my dice and moved my mice. And now I own a place outright that I was forced to build myself to save money; I'm proud of both, and that's worth something.

Q: What's next?
A: Our goal for 2011 is to get the place to a point where we can use it. That will mean insulation, the primary heat (as opposed to the woodstove, which will come later), plumbing, and the bathroom. Stay tuned.

Tuesday, August 10, 2010

Book Review Tuesday!

LSW here. During these times of trial cabin-building days, we've often turned to the local library for advice, instruction and 25 cent coffee. One book that the Vermonster has found to be invaluable was this:
He's renewed it so many times that the librarians know him. And the book. It's been out of circulation for a few months now. Apparently it was pretty helpful, because we now have power in the cabin.
That was the book he found most informative.
I, on the other hand, was excited to find this at the library booksale:
I found it on the last day of the five-day booksale, and I have no idea how it didn't get scooped up way before I got to it. I haven't had a chance to read it yet, but flipping through it, I was excited to see that it truly is a manual with instructions on how to dig and where. I just noticed that it's written by a woman. For some reason, this surprises me. Some feminist I am.

Sunday, July 18, 2010

The Hookup


Last Friday I did a day-trip to Shangri-La for the well hookup. The evening before, Taylor Excavating was on site to dig the trench from the well to the cabin. Record Concrete had left a hole in the foundation for the water with 2 PVC pipes that extended 4 feet beyond the foundation walls. As Dan Taylor had done the foundation excavating, he knew right where to find them.


On Friday, I rolled in at about 8 am, and Green Mountain Well pulled in at about 10. While I continued the electrical work - completing the rear lighting circuit and beginning on the bathroom - they installed the pressure tank, ran the lines, and lowered the pump into the well. After I made the electrical connection (they can do a run directly to the fuse box, but aren't licensed to tie into the line I had already provided), we fired 'er up. Pump? Check. Pressure? 50 lbs - Check. Cold, fresh water? Check.

We're in business.


Dan Taylor was back by 2:30 to fill in the trench, and by 5 pm I was back on the road. For those of you keeping score, the well package rang up at $6545, and the excavating $440. Water ain't cheap, but we sure are happy to have it.

Saturday, June 26, 2010

The Remains of the Day

Is there anything better than sitting in a comfortable recliner, fresh from a hot shower and a cold IPA in hand after 6 hours of travel and 5 hours of hard labor? Save your breath - I can state conclusively that there isn't. Unless you garnish the scene with a hot barbecue pulled pork sandwich topped with cold slaw. And maybe some sweet potato fries. Ah, well - 3 out of 5 ain't bad.

It's troubling, however, that my 5 hours of work bought me about 1/3 more siding on the back wall. That's about 6 boards total, to be honest. If you subtract the setup and tear-down time, that's an astonishing 1 hour per board. Now, granted, there was measuring, cutting and test-fitting multiple times to accommodate the upstairs window, and most had to be stained after they were up, but really, 1 hour per board?? At this rate, the siding will finally be complete - what? - just before I'm dead? They say slow and steady wins the race, though, so I plod along...

It was a milestone day, however, as I was finally working from a power cord plugged into an in-cabin outlet. Yes, CVPS hooked us up yesterday, and Hennessey finished connecting the various circuits into the box. The wiring itself isn't quite done, but the circuits that are now have power. The cloud to this silver lining, however, is that I also got the bill: $847 - about $200 more than I budgeted. Not that the bill from Hennessey was unreasonable - the criticism is aimed solely at my optimistic budgeting. For the record, Hennessey was a pleasure to deal with - I'd recommend them without hesitation.

So now we're waiting on the state to approve the revised septic plan, and Taylor Excavating to provide an estimate. I dare not hope that Dan will tell me that the septic will be $3,500 bucks, but unless he does we won't have both a well pump and a septic system this year. Still, with electrical in the house, we have the option of carting in our own water and staying overnight. Hell, we could even splurge on a solar camping shower and portable toilet and make the accommodations downright luxurious. Huh. I wonder how the LSW would feel about that?

Sunday, June 20, 2010

Wired

I have a new appreciation for why electricians charge what they do. It's not so much that the work is hard as that it takes forever. I have 40+ hours into the wiring effort so far, including design work at home and 2 solid weekends drilling holes, running/stripping/splicing wire, hooking up receptacles, switches and fixtures, and wrapping with electrical tape. The LSW added a few more in doing the same and attaching nailing plates to the studs to ensure we don't drive nails through the wire after the wallboard is up. Half of this work took place during the monsoons last weekend, as the LSW previously reported. The other half took place on Thursday and Friday.

Like anything, the process gets easier as you go. You run a circuit, realize you've made mistakes, and redo it. Or you find an easier way halfway through. A few things I learned the hard way:
  • Receptacles are polarized. The hot (black or red wire) should be on the side with the narrow slot, and the neutral wire (white) should be on the side with the wider slot.
  • Make the pigtails (short wires running from a switch or receptacle to a wire nut) long enough to work with.
  • Don't try and cram everything together. I tried to branch a feeder wire to 4 separate lighting circuits in a triple-gang switch box, and found I couldn't cram it all in once all the connections were made. After mulling this over all night I realized that I should have done the branching in a double gang box in the basement below the switches, simplifying both my connections at the switches and my ability to trace the circuit later.
  • Working in a crawlspace sucks. Every single time I went down there I tried to stand up and cracked my skull against a floor joist. Next time: A full basement.
  • Spacing floor joists 1 foot on center is great for stability, but makes it really hard to drill holes to run wires...
The monsoon weekend, I was able to run the 15-amp general receptacle circuit, the 50-amp range circuit, the 20-amp basement GFI socket circuit, and the 20-amp, 240-volt well pump circuit. With these in place, I left a key with Hennessey electric, and they hooked the circuits into the panel, installed the meter socket and got me ready for CVPS to hook up the power. There were two challenges here:
  • The service hookup in Vermont has to be to a gable end, has to be at least 16' above grade, and must be more than 3' from any window. This was a challenge, but CVPS allowed me to come in above the window at the very tip of the gable, despite the fact that I didn't quite have the space.
  • A load panel (aka 'fuse box') is supposed to be placed so that there is 36' inches around it for access. It can't be over a counter or in a closet, and it can't go in a crawlspace. There is no building inspector in Shangri-La, but I wanted everything to be code if possible. This meant that the panel had to go near the front door even though the serviced came in by the back door. To do this, Hennessey had to install a second 100-amp circuit breaker below the meter, to allow the power between the meter and the box to be cut if possible. (Not really a challenge, but certainly more money!)

At this point, I expect I have about 8 hours of wiring left to go. Adding up the receipts, so far I have over $1,300 in materials and - I expect - about $300 for labor. I'm thinking I saved about $1,000 in labor by doing it myself.

While we were working on this, Green Mountain Well was on site drilling for water. More about that in the next post...

Monday, June 7, 2010

The Other 60 Percent

I read somewhere that when you have a lockable shell, you're only about 40 done. That seems slightly pessimistic when I quickly tick off the remaining items, but clearly realistic when I sit down to write out what still needs to be done in detail. Add in the amount of time it actually takes to cross any given item off the list, and you begin to wonder if you'll ever actually be finished.

But "the journey of a thousand miles begins with a single step", and so each weekend I plod along, a bit overwhelmed but still enjoying the journey. Since the last post, there have been 3 trips to Shangri-La, two solo and one with LSW and The Boy in tow.

On the first trip I arrived with a punch list of items: Finish siding the south wall, build the bridge between the lofts, and put up the walls in the crawlspace. A solid day's work, I figured forgetting that a day is 24 hours at best, and only 8 hours realistically given the 6 hours of travel. In the end, the siding was all I accomplished, and even that I ran out of before the south wall was done.

No worries, though - we had planned an overnight the following weekend, and we had big plans to make bigger progress. We were up early and out on time for once, the wife actually stayed awake the whole trip and companionable banter sped the journey along. The Boy was in a good mood, the sun was shining and the mercury settled in the low 70s. Everything was absolutely perfect until we pulled up in front of the cabin and I turned off the car.

"Tell me you brought the keys," I said to the LSW.
"I thought you had them," she replied.
Son of a ...

Faced with a challenge from the universe to practice my zen actively, I calmly dropped the family at our beloved Saxtons River Inn, and spent the next 6 hours in a round-trip journey to retrieve the keys.

Here's the thing, though: Compelled to book a second night, we were pleased to be given the best room in the place "because we were regulars". Sitting that second night with a cold beer after a long day of work on our private front porch overlooking the main street, I had one of those moments where everything - and I mean everything - felt perfect and I knew life could not possibly be any better. So there was that, anyway.

And what did we get done? The deck framing is in place for the front porch, the rear gable is ready for the power hookup and both the general and oven circuits have been run. Less work than I thought we could accomplish, but what else is new?

This last weekend I was on the road by 5:30 am and hard at work by 8:45. I would have been there a little sooner, but I couldn't resist stopping at the Saxtons River Market for a bottled water and a hot donut. Those donuts will kill me one day, but what a way to go. The weather was deceptive: It was the kind of day where you felt slightly chilled while standing still, but were pouring rivers of sweat as soon as you lifted any tool. Really, really, really, humid. I didn't do too bad, though: The walls are up in the crawlspace and the bridge is finally built between the lofts. I rewarded myself with a hot roast beef and Cheddar from the Putney Co-op and listened to the dishy 'Mrs. Astor Regrets' on CD on the way home. The latter is a guilty pleasure, but then who doesn't like to hear about the self-destruction of the rich?

Unless of course, you're the rich in question. Then it just sucks.

In other news, Larry expects to get the meter socket on the house this week, and he'll be contacting me soon about running the power to the panel and hooking up the first couple of circuits. I understand that the revised septic plans are on their way to the State of VT as of last Friday, and even as I write I'm waiting for a callback from Green Mountain Well Drilling about moving my well date from the end of July to the end of June. All good stuff.

Monday, April 26, 2010

The 2010 working season begins!

So I'm up at 6 and ready to go at 6:30. The LSW, however, is sick, and The Boy has decided to spite me by sleeping in for the first time...well, ever. Despite these obstacles, somehow we're on the road by 7:45 - not bad, all things considered.

And what's the occasion? The electrician is meeting with me at 11 AM to talk through my wiring plans. I've got it in my head that I can wire most of the place by myself, and I'm looking for a paid mentor to ensure that I don't kill us all with wayward electrons.

'Larry' shows up promptly at 11 and is polite and professional, despite the fact that I've come up with a 200-amp, 13-circuit plan to wire a 16' x 28' shoebox. And 4 of those circuits are 240 volt. His changes are modest: Take the refridgerator off the GFI circuit and make all the 15-amp circuits 20-amp instead. And we agree to ditch 2 items in the original plan: A generator hookup and a motorhome hookup. Both can be added later if needed, and neither of us can envision my father being able to navigate his bus-sized RV up my narrow dirt road. So what am I planning?

Circuit 1: General purpose receptacle loop - 9 plugs, a smoke detector and a closet light
Circuit 2: Refrigerator plug
Circuit 3: Rear spotlight, kitchen light, kitchen work lights, bath fan/light and bath vanity light
Circuit 4: Front spotlight, entry light, porch light, and main track lights
Circuit 5: Microwave
Circuit 6: Crawlspace receptacles (GFI), exterior receptacles, and crawlspace lights
Circuit 7: Bath receptacles (GFI - separate circuit required by code)
Circuits 8 and 9: Kitchen receptacles (GFI - 2 circuits required by code)
Circuit 10: Range/Oven
Circuit 11: Well pump
Circuits 12 and 13: 9,000 watts of electric baseboard heating for the cabin and crawlspace

And why am I heating the crawlspace? Well, I'm not - not all of it, anyway. The land slopes, leaving half the foundation exposed. To be sure we can use the place in the winter without water lines freezing, I've Isolated all of the plumbing to the wall separating the kitchen from the bath. In the crawlspace below, I'm going to frame in an insulated 10' x 8' room for the expansion tank, hot water heater (electric) and plumbing. I'll heat this with a 4' baseboard heater on its own thermostat, and empty the lines when we're not there.

I considered propane heat for the cabin, but between the super-insulation and the small size, I'm thinking electrical might not be that much more expensive, especially as we're going to install a small wood stove. In the long run, we're likely to install solar and feed the power back to CVPS, which - given that we'll only use the place on weekends - should make our electrical essentially free.

So Larry will take care of the hookup and anything needed to get to the breaker panel, and then he'll inspect my work and hook it in when I'm done. I'm buying all of the materials from the panel on, running all the wires and tying everything together. Or that's the plan, anyway.

It was a beautiful day to work, as it turned out. 70 degrees, few bugs, and The Boy stayed on his best behavior despite the long day and long trip. And despite illness, the LSW managed to help me get another 15' of siding up, which was pretty good considering how slow the siding went when I was working by myself.

And so the work begins for another year...

Tuesday, June 9, 2009

Countdown to Phase Two

Once again last week I traded 6 hours in the truck for 1 hour on site. Remember my previous post about assuming nothing? Well I realized after our last trip that I hadn't verified the width of the walls, the size of the cellar hatch opening, the distance from the slab to the beam, etc. So, tape measure in hand, I left the house at 6:30 AM.

At least it was a nice day for a drive - sunny and about 75 - and, being Saturday, relatively light traffic. I arrived on site to find that the Excavator had completed the back-filling, removed the last tree that would block the drilling rig's access to the well site, and cleared the short stretch of brush to the nearest CVPS pole.

God this guy did a nice job. He worked a miracle on my (formerly) sloped property, and left me with a rock retaining wall to support the driveway and a nice rock border on the up-slope side of the driveway that tied into the wall we cut the driveway through. The septic job is his next year if he wants it.

I was surprised to find that the electrician had already put up the board for the temporary power, but disappointed to see that CVPS hadn't yet hooked it up. In a call to CVPS yesterday, they said the weather has been lousy and they hoped to have it in place next week - not good as we're supposed to begin building the floor this weekend. That will add 2 day's rental of a generator to my costs - about $120.

Turned out that the measurements were different from my assumptions, but not enough to have been fatal. No fox sightings this time, but I was visited by a bright yellow bird with black wings that I've never seen in the 'burbs.

Next weekend begins 'Phase Two'. Our goal: Lay down the sills and get the floor framed in preparation for help from my sister's family a the end of June.

Tuesday, March 31, 2009

SWAGing CVPS


In the corporate world, if you have to estimate something but really have no idea, you put a figure on paper and let everyone know that it’s a ‘SWAG’. That is, a ‘Silly, Wild-Assed Guess’. In cobbling together an estimated budget for The Dream, I did the same thing in a couple of areas – one of them being getting power to the cabin. $500 should cover it, I thought; $750 at the most.

Wrong.

Discussions with the good folks at Central Vermont Public Service Corp (and they really were a pleasure to talk with) yielded a revised figure of about $35/foot. The good news is that I’ve got that power company right-of-way on the property; the bad news is that I’ve still got about 110 feet from the closest pole to the cabin site. Anyone? Anyone? That’s right: $3,500 – almost 5 times what I anticipated.

Ouch.

The way I see it, my other option is a generator for construction – $750 to $1,500 – followed by solar power for the well pump and house for as little as $750 - $2,000. The solar-powered well pump is low-flow, however, and will require a holding tank at a higher elevation than the house, so the overall cost is likely to exceed the CVSC hookup fee. To be fair, I suppose we could also go with hand tools and a manual pump for the well, but I’m not sure we’re willing to ‘get back to the land’ quite that far.

I was told that the CVPS estimate was free, so I’ve opened a work order and hope to meet with a rep in a couple of weeks to get the ‘official rough estimate’. The excavator opined that sending the line underground would probably be about the same price once you factor in the additional pole and tree clearing that will likely be necessary. If I go with this option, CVSC suggested that I send the power through the foundation and have an electrician hook up the meter on a temporary board with some outlets rather than using a pole on the edge of the job site. This will save me about $80 as I won’t need the company to move the power line to the house later, and we all know that $80 saved is $80 earned.

Fortunately, this was the last SWAG I had in the budget. In the future, I’ll be blaming my low numbers on ‘the optimism factor’.