Is there anything better than sitting in a comfortable recliner, fresh from a hot shower and a cold IPA in hand after 6 hours of travel and 5 hours of hard labor? Save your breath - I can state conclusively that there isn't. Unless you garnish the scene with a hot barbecue pulled pork sandwich topped with cold slaw. And maybe some sweet potato fries. Ah, well - 3 out of 5 ain't bad.
It's troubling, however, that my 5 hours of work bought me about 1/3 more siding on the back wall. That's about 6 boards total, to be honest. If you subtract the setup and tear-down time, that's an astonishing 1 hour per board. Now, granted, there was measuring, cutting and test-fitting multiple times to accommodate the upstairs window, and most had to be stained after they were up, but really, 1 hour per board?? At this rate, the siding will finally be complete - what? - just before I'm dead? They say slow and steady wins the race, though, so I plod along...
It was a milestone day, however, as I was finally working from a power cord plugged into an in-cabin outlet. Yes, CVPS hooked us up yesterday, and Hennessey finished connecting the various circuits into the box. The wiring itself isn't quite done, but the circuits that are now have power. The cloud to this silver lining, however, is that I also got the bill: $847 - about $200 more than I budgeted. Not that the bill from Hennessey was unreasonable - the criticism is aimed solely at my optimistic budgeting. For the record, Hennessey was a pleasure to deal with - I'd recommend them without hesitation.
So now we're waiting on the state to approve the revised septic plan, and Taylor Excavating to provide an estimate. I dare not hope that Dan will tell me that the septic will be $3,500 bucks, but unless he does we won't have both a well pump and a septic system this year. Still, with electrical in the house, we have the option of carting in our own water and staying overnight. Hell, we could even splurge on a solar camping shower and portable toilet and make the accommodations downright luxurious. Huh. I wonder how the LSW would feel about that?
A middle-aged corporate everyman struggles to realize his dreams of a place in the country
Shangri La
Showing posts with label CVPS. Show all posts
Showing posts with label CVPS. Show all posts
Saturday, June 26, 2010
Saturday, March 6, 2010
Checking In - February Edition
Ran up to Shangri-La on a Saturday morning in mid-February to talk with a CVPS field technician after receiving a letter informing me that poles need to be replaced in my right-of-way this year. I wasn't opposed to the work, but I wanted to understand how they would access the property and what the work would involve.
Remembering the winter before, I expected to have a hard time walking the property, figuring there would be 2 -3 feet of snow on the ground. I reality, there was less than a foot of very hard snow. I got there about an hour before we were supposed to meet and spent a little time in and around the cabin before walking the right-of-way down the hill to where our road meets the state highway. There were lots of animal tracks - including what looked to be moose tracks - everywhere. Living up here should give The Boy a good education in fauna to supplement his self-study in mushrooms.
Dave pulled up in a CVPS truck about a half-hour ahead of schedule, and we spent some time down at the new pole they put in last spring for my power feed talking about the work. Some notes from our conversation:
Remembering the winter before, I expected to have a hard time walking the property, figuring there would be 2 -3 feet of snow on the ground. I reality, there was less than a foot of very hard snow. I got there about an hour before we were supposed to meet and spent a little time in and around the cabin before walking the right-of-way down the hill to where our road meets the state highway. There were lots of animal tracks - including what looked to be moose tracks - everywhere. Living up here should give The Boy a good education in fauna to supplement his self-study in mushrooms.
Dave pulled up in a CVPS truck about a half-hour ahead of schedule, and we spent some time down at the new pole they put in last spring for my power feed talking about the work. Some notes from our conversation:
- The company plans to put in heavier lines to protect against falling limbs and ice storms. This is going to involve adding a third pole to the right-of-way, but it should benefit us, as problems with any portion of the line will kick out power at the bottom of my property, meaning we lose power, too.
- The company will access the property where the right-of-way meets the state road. They have equipment that will climb right over the stone wall, so no new curb cuts will be made, and no additional trees need to be felled.
- They access the property the same way about once every 10 years to clear the undergrowth in the right-of-way. All brush is chipped and left on the property. Any trees cut can be chipped, but they can be cut into fireplace length and stacked if the homeowner prefers.
- The connection to the cabin will need to be 16' off the ground and 3' away from the loft window. This is going to be close - I'll have to bring a measuring tape up next time to see if this will be possible. My other option - as discussed previously - is to go underground at considerably higher expense.
- Dave noted that he has lived his whole life in southern Vermont, and had never heard of Shangri-La until he was assigned work here.
- Dave's wife has people in SW Connecticut, one town over from where we live. Consequently, he's familiar with the area. Doesn't care for it, though - too many people and too crowded. "I'm a country boy at heart." Amen, brother.
Monday, June 22, 2009
Framing the Floor

As the LSW reported, we made significant progress last week. We began work at noon on Saturday, and – despite rain and drizzle Sunday morning - managed to get 90% of the floor done by Sunday at 3. I drove back up by myself on Wednesday to finish the job.
My notes from this effort:
The wood was delivered wrapped in metal strapping. I figured there must be some way to remove it without a metal cutter (one of the few things I didn't bring), but I’ll be damned if I could figure it out. In the end we had to shimmy the first piece in each bundle out to loosen the tension and get the rest free. Next time, I’ll bring metal snips.
The top of the foundation looked more level than it actually was. The sills bolted down tight, but after the floor and face joists were in place, I was left with 1/8" to 1/4" gaps in the northeast and northwest corners. I began to shim them, but decided to wait until the walls and roof were up to see if the weight of the whole structure closed them.
I didn’t think to check how the metal bridging – which is sold flat – actually gets installed. My intention had been to install two rows, each about 5’ in from the face joists. I ended up bending the first row into a ‘z’ shape and nailing them to the inside faces of each joist. Something about this didn’t seem right to me, but I went from one end of the building to the other anyway. When I got home and looked it up, I saw that each end should be nailed to the top and bottom of adjacent joists, and felt like an idiot. After installing a row correctly on Wednesday, I considered ripping out first row, but decided to leave them in place so that the next owner can wonder what the hell I was thinking.
My new Paslode cordless pneumatic nailer performed flawlessly; it’s going to be worth its weight in gold.
On Wednesday, CVPS was on site swapping out the pole that is going to feed power to the house. I spent some time talking with the crew, and learned that the Advantek floor sheathing I was using is face-treated with water-proofing, so it should stand up to the elements until I have the roof on. I had hoped that they would hook up my temporary panel, but that, apparently, is a separate job. When I called CVPS on Monday, they expected to complete the job within a week.
After all of the sheathing was in place, I was in the crawlspace installing the bottom ends of the bridging and found myself looking repeatedly at the hatch. There is something about working in a space from which the is only one exit that is unnerving. Not that I expected a bear or the guys from ‘Deliverance’ to show up, but if they did…
The town was hosting a small tag sale and fair at the meetinghouse to raise money for it’s repair. The food was tasty and the folks were very nice. It was nice to see ‘Chris’ again, whom we had met previously at the bar of the Saxton’s River Inn. We also got to go into the meetinghouse for the first time to see first-hand that it needs a lot of work. It really does look like nothing has been done to it since 1817. We made a $50 donation, which I figured was the least we could do to preserve our view.
The LSW easily pulled her weight and made the job more enjoyable, and The Boy was well-behaved despite missing his nap and provided much-needed oversight from the sidelines.
The wood was delivered wrapped in metal strapping. I figured there must be some way to remove it without a metal cutter (one of the few things I didn't bring), but I’ll be damned if I could figure it out. In the end we had to shimmy the first piece in each bundle out to loosen the tension and get the rest free. Next time, I’ll bring metal snips.
The top of the foundation looked more level than it actually was. The sills bolted down tight, but after the floor and face joists were in place, I was left with 1/8" to 1/4" gaps in the northeast and northwest corners. I began to shim them, but decided to wait until the walls and roof were up to see if the weight of the whole structure closed them.
I didn’t think to check how the metal bridging – which is sold flat – actually gets installed. My intention had been to install two rows, each about 5’ in from the face joists. I ended up bending the first row into a ‘z’ shape and nailing them to the inside faces of each joist. Something about this didn’t seem right to me, but I went from one end of the building to the other anyway. When I got home and looked it up, I saw that each end should be nailed to the top and bottom of adjacent joists, and felt like an idiot. After installing a row correctly on Wednesday, I considered ripping out first row, but decided to leave them in place so that the next owner can wonder what the hell I was thinking.
My new Paslode cordless pneumatic nailer performed flawlessly; it’s going to be worth its weight in gold.
On Wednesday, CVPS was on site swapping out the pole that is going to feed power to the house. I spent some time talking with the crew, and learned that the Advantek floor sheathing I was using is face-treated with water-proofing, so it should stand up to the elements until I have the roof on. I had hoped that they would hook up my temporary panel, but that, apparently, is a separate job. When I called CVPS on Monday, they expected to complete the job within a week.
After all of the sheathing was in place, I was in the crawlspace installing the bottom ends of the bridging and found myself looking repeatedly at the hatch. There is something about working in a space from which the is only one exit that is unnerving. Not that I expected a bear or the guys from ‘Deliverance’ to show up, but if they did…
The town was hosting a small tag sale and fair at the meetinghouse to raise money for it’s repair. The food was tasty and the folks were very nice. It was nice to see ‘Chris’ again, whom we had met previously at the bar of the Saxton’s River Inn. We also got to go into the meetinghouse for the first time to see first-hand that it needs a lot of work. It really does look like nothing has been done to it since 1817. We made a $50 donation, which I figured was the least we could do to preserve our view.
The LSW easily pulled her weight and made the job more enjoyable, and The Boy was well-behaved despite missing his nap and provided much-needed oversight from the sidelines.
Sadly, this was our last stay at the Saxton’s River Inn before the camping begins. Dinner again was excellent, and homemade donuts and pastries have been added to breakfast. I’ll miss the place – it feels like home at this point.
Next up: Raising the walls with my sister’s family.
Next up: Raising the walls with my sister’s family.
Labels:
Advantek,
CVPS,
Framing,
Paslode,
Saxtons River Inn
Tuesday, June 9, 2009
Countdown to Phase Two
Once again last week I traded 6 hours in the truck for 1 hour on site. Remember my previous post about assuming nothing? Well I realized after our last trip that I hadn't verified the width of the walls, the size of the cellar hatch opening, the distance from the slab to the beam, etc. So, tape measure in hand, I left the house at 6:30 AM.
At least it was a nice day for a drive - sunny and about 75 - and, being Saturday, relatively light traffic. I arrived on site to find that the Excavator had completed the back-filling, removed the last tree that would block the drilling rig's access to the well site, and cleared the short stretch of brush to the nearest CVPS pole.
God this guy did a nice job. He worked a miracle on my (formerly) sloped property, and left me with a rock retaining wall to support the driveway and a nice rock border on the up-slope side of the driveway that tied into the wall we cut the driveway through. The septic job is his next year if he wants it.
I was surprised to find that the electrician had already put up the board for the temporary power, but disappointed to see that CVPS hadn't yet hooked it up. In a call to CVPS yesterday, they said the weather has been lousy and they hoped to have it in place next week - not good as we're supposed to begin building the floor this weekend. That will add 2 day's rental of a generator to my costs - about $120.
Turned out that the measurements were different from my assumptions, but not enough to have been fatal. No fox sightings this time, but I was visited by a bright yellow bird with black wings that I've never seen in the 'burbs.
Next weekend begins 'Phase Two'. Our goal: Lay down the sills and get the floor framed in preparation for help from my sister's family a the end of June.
At least it was a nice day for a drive - sunny and about 75 - and, being Saturday, relatively light traffic. I arrived on site to find that the Excavator had completed the back-filling, removed the last tree that would block the drilling rig's access to the well site, and cleared the short stretch of brush to the nearest CVPS pole.
God this guy did a nice job. He worked a miracle on my (formerly) sloped property, and left me with a rock retaining wall to support the driveway and a nice rock border on the up-slope side of the driveway that tied into the wall we cut the driveway through. The septic job is his next year if he wants it.
I was surprised to find that the electrician had already put up the board for the temporary power, but disappointed to see that CVPS hadn't yet hooked it up. In a call to CVPS yesterday, they said the weather has been lousy and they hoped to have it in place next week - not good as we're supposed to begin building the floor this weekend. That will add 2 day's rental of a generator to my costs - about $120.
Turned out that the measurements were different from my assumptions, but not enough to have been fatal. No fox sightings this time, but I was visited by a bright yellow bird with black wings that I've never seen in the 'burbs.
Next weekend begins 'Phase Two'. Our goal: Lay down the sills and get the floor framed in preparation for help from my sister's family a the end of June.
Labels:
CVPS,
Electrical,
Foundation,
Land Preparation
Sunday, May 31, 2009
The Impending Construction

Driving to the Home Depot yesterday, I thought I had a revelation: Build the floor, cover it in plastic, and put in the well, and bank the remainder for the septic system after the 'supplemental' test next April. My thinking: The well and septic are the 'big ticket' items; the cabin can be built as money allows. And a site with well, septic and foundation would maximize my resale should I have to sell before being able to build the cabin. On the way home, however, I realized the that what I was really looking to do was find a way to escape the occasionally overwhelming logistics and anxieties that come with building a house, even if it is only a 'cabin'.
Here's the thing: I'm down to about $13,000, and I still have structure, well and cabin to go. The well will likely cost about $5,000, the septic about $6,000, the cabin shell about $10,000, and finishing about $10,000. My usual annual bonus, though modest, would have been a big help, but the recession/depression has ensured that I'm unlikely to see it again until - what? - 2011?
Installing well and septic with the money might ensure the best resale, but we can't envision a scenario in which we'd sell, so who cares? And is it really feasible to build the cabin 'as money allows'? What good is a floor and two walls, or even 4 walls and a loft? And so we come back to the original plan: Build a simple, lockable shell this year, and bank anything left over for septic next year. At least with a shell we have a place to 'camp', even if we're carting in our own water and using a mulching toilet. We've got a place we can use, if only for weekends. And a place we can stay while we're working on the rest.
The LSW has already reported on the foundation sealing work last weekend. (And how she got lost and found herself with a speeding warning while I paced the streets of Saxton's River wondering where the Dickens she was. With no cell service around Shangri-La, I couldn't just call her and ask.) I'm currently waiting for the excavator to let me know that backfilling is complete and the path to the nearest CVPS pole is cleared so I can get temporary power installed. Our hope is to do an overnight on June 13th to both install the sills and attend the meetinghouse fundraiser that Saturday. My sister and her family are planning on camping with us on June 27 to begin the construction proper, so things are going to start moving quick.
To do:
1) Finalize the plans and place an order with the local lumberyard
2) Install the sills
3) Contact the electrician to get temporary power service installed
4) Contact CVPS to let them know the pole can be replaced and temporary power hooked up
5) Make reservations at the local campground for June 27th and July 4th
6) Dig out the camping equipment and see what we're missing (its been a long time since we camped!)
For those of you keeping score, the foundation sealant was a petroleum-based, fibered foundation/roofing tar that came in 5 gallon containers from my local Lowe's for about $35 each. We went to Shangri-La with 20 gallons, but only needed 10 for two coats. Each coat took about 4 hours, and it was a mess despite our best attempts to be careful. Here's a few more pics from the foundation sealing weekend:

PS: The change in management at the Saxton's River Inn has had generally positive results: I felt that the food was just as good, while the LSW thought that it had gone just slightly down-hill. The breakfast offerings - though still limited - were about 50% better, however, so overall we were satisfied that it would remain one of our favorite New England Inns.
Tuesday, March 31, 2009
SWAGing CVPS

In the corporate world, if you have to estimate something but really have no idea, you put a figure on paper and let everyone know that it’s a ‘SWAG’. That is, a ‘Silly, Wild-Assed Guess’. In cobbling together an estimated budget for The Dream, I did the same thing in a couple of areas – one of them being getting power to the cabin. $500 should cover it, I thought; $750 at the most.
Wrong.
Discussions with the good folks at Central Vermont Public Service Corp (and they really were a pleasure to talk with) yielded a revised figure of about $35/foot. The good news is that I’ve got that power company right-of-way on the property; the bad news is that I’ve still got about 110 feet from the closest pole to the cabin site. Anyone? Anyone? That’s right: $3,500 – almost 5 times what I anticipated.
Ouch.
The way I see it, my other option is a generator for construction – $750 to $1,500 – followed by solar power for the well pump and house for as little as $750 - $2,000. The solar-powered well pump is low-flow, however, and will require a holding tank at a higher elevation than the house, so the overall cost is likely to exceed the CVSC hookup fee. To be fair, I suppose we could also go with hand tools and a manual pump for the well, but I’m not sure we’re willing to ‘get back to the land’ quite that far.
I was told that the CVPS estimate was free, so I’ve opened a work order and hope to meet with a rep in a couple of weeks to get the ‘official rough estimate’. The excavator opined that sending the line underground would probably be about the same price once you factor in the additional pole and tree clearing that will likely be necessary. If I go with this option, CVSC suggested that I send the power through the foundation and have an electrician hook up the meter on a temporary board with some outlets rather than using a pole on the edge of the job site. This will save me about $80 as I won’t need the company to move the power line to the house later, and we all know that $80 saved is $80 earned.
Fortunately, this was the last SWAG I had in the budget. In the future, I’ll be blaming my low numbers on ‘the optimism factor’.
Wrong.
Discussions with the good folks at Central Vermont Public Service Corp (and they really were a pleasure to talk with) yielded a revised figure of about $35/foot. The good news is that I’ve got that power company right-of-way on the property; the bad news is that I’ve still got about 110 feet from the closest pole to the cabin site. Anyone? Anyone? That’s right: $3,500 – almost 5 times what I anticipated.
Ouch.
The way I see it, my other option is a generator for construction – $750 to $1,500 – followed by solar power for the well pump and house for as little as $750 - $2,000. The solar-powered well pump is low-flow, however, and will require a holding tank at a higher elevation than the house, so the overall cost is likely to exceed the CVSC hookup fee. To be fair, I suppose we could also go with hand tools and a manual pump for the well, but I’m not sure we’re willing to ‘get back to the land’ quite that far.
I was told that the CVPS estimate was free, so I’ve opened a work order and hope to meet with a rep in a couple of weeks to get the ‘official rough estimate’. The excavator opined that sending the line underground would probably be about the same price once you factor in the additional pole and tree clearing that will likely be necessary. If I go with this option, CVSC suggested that I send the power through the foundation and have an electrician hook up the meter on a temporary board with some outlets rather than using a pole on the edge of the job site. This will save me about $80 as I won’t need the company to move the power line to the house later, and we all know that $80 saved is $80 earned.
Fortunately, this was the last SWAG I had in the budget. In the future, I’ll be blaming my low numbers on ‘the optimism factor’.
Sunday, January 4, 2009
Lawyers and Easements

Soon after a sale contract was drawn up, I realized I probably should have a lawyer. I was a little fuzzy on what he/she would do, given that I wasn't selling a property to buy this one. I figured the seller's attorney would handle most of the work.
The attorney I had used for the recent sale of Connecticut home appreciated my thinking of him, but suggested that I really needed a Vermont lawyer for a Vermont property. He was too nice to add 'moron', but he probably thought it.
I googled lawyers in the Shangra-La area, and called one at random. He sounded like a friendly and knowledgeable guy, and I figured my search was over until he said, "Wait a minute, what street is the land on?" He turned out to be the attorney representing the seller. What are the odds? (Probably pretty good, actually; Vermont has one of the smallest populations in the union.)
A few calls later and I was set. Turns out my attorney would review the contract, do the title search, calculate the closing costs, and make sure the purchase is registered with the appropriate authorities. All for about $1,000, which seemed to be the going rate. And she'd look into one other thing...
There as a single power line cutting across the western corner of the land, apparently feeding the neighbor at the top of the hill to the north. The property - wooded everywhere else - had been cleared on either side of the line. The realtor dug up an easement for Central Vermont Public Service Corporation that had been granted in 1996, but the language seemed vague. Did the presence of the easement mean that CVPS could replace the current (rather unobtrusive) line with 100' transmission towers in the future?
I had contacted CVPS and was informed that the right-of-way had been defined when the line first went up. At only 50 feet wide, it would limit CVPS's possibilities in the future, though they could string more lines on the existing poles. Furthermore, CVPS had the right to clear the property annually of any trees or branches within the easement's boundaries. As we had suspected, the power line was for the neighbor.
My lawyer did some checking and confirmed the information I had received. She felt that I was unlikely to have problems in the future. Having an easement on the property wasn't optimal, but it didn't seem that big a deal, either, and we decided to move forward.
Subscribe to: