The Hookup


Last Friday I did a day-trip to Shangri-La for the well hookup. The evening before, Taylor Excavating was on site to dig the trench from the well to the cabin. Record Concrete had left a hole in the foundation for the water with 2 PVC pipes that extended 4 feet beyond the foundation walls. As Dan Taylor had done the foundation excavating, he knew right where to find them.


On Friday, I rolled in at about 8 am, and Green Mountain Well pulled in at about 10. While I continued the electrical work - completing the rear lighting circuit and beginning on the bathroom - they installed the pressure tank, ran the lines, and lowered the pump into the well. After I made the electrical connection (they can do a run directly to the fuse box, but aren't licensed to tie into the line I had already provided), we fired 'er up. Pump? Check. Pressure? 50 lbs - Check. Cold, fresh water? Check.

We're in business.


Dan Taylor was back by 2:30 to fill in the trench, and by 5 pm I was back on the road. For those of you keeping score, the well package rang up at $6545, and the excavating $440. Water ain't cheap, but we sure are happy to have it.

No comments: