Tuesday, August 18, 2009

No, I didn't kill myself on the job...


Now that both of you who read this blog have given up on the idea that I will ever post again, I'm back. What can I say? I've been too busy working on the cabin to spend time writing about it.


Since the LSW's last post on July 1, we've spent 3 long weekends and 2 additional Saturdays finishing the walls and sheathing, framing the lofts and roof, and working through the 'punch list'.


Some random notes:
1) Camping in tents absolutely sucks (see the aforementioned 7/1 LSW post)
2) Camping in a bus-sized motor coach ain't nearly so bad (thanks, dad!)
3) A certain motor lodge on Rt 30 can be packed every time you pass it and still be found to be dirty and filled with spiders when you finally book yourself in
4) Super 8 is actually a very clean, economical, and convenient option, especially after you've checked yourself out of a certain spider-infested motor lodge on Rt 30
5) Suffering through a very cool and rainy June and July is infinitely preferable to working in a suddenly hazy, hot and humid August. Thank god we got most of the framing done before the weather turned!
6) When framing a roof, it really helps to have people taller than 5'5" around. Kudos to my sister for marrying above her, so to speak.
7) Note to self for the next time: It is the rafters that should be 12" on center, not the loft joists that connect them. It took a lot of extra 2x4s to ensure that the roof sheathing would have something to land on.
8) Pulling down all of the wall sheathing and re-hanging it is not fun. If you're learning as you go, read the directions before committing the materials.
9) A 12/12 pitch roof (45 degrees) is not for the timid, even if it does begin only 9' off the ground.
10) The money goes really, really quickly.

We're now taking a 2-3 week break while the roofers sheath and shingle (see #9 above). The windows have been ordered - 6 at 3'x4' and 3 at 3'x3' - and should be in by 8/27.


No comments: