Tuesday, June 9, 2009

Countdown to Phase Two

Once again last week I traded 6 hours in the truck for 1 hour on site. Remember my previous post about assuming nothing? Well I realized after our last trip that I hadn't verified the width of the walls, the size of the cellar hatch opening, the distance from the slab to the beam, etc. So, tape measure in hand, I left the house at 6:30 AM.

At least it was a nice day for a drive - sunny and about 75 - and, being Saturday, relatively light traffic. I arrived on site to find that the Excavator had completed the back-filling, removed the last tree that would block the drilling rig's access to the well site, and cleared the short stretch of brush to the nearest CVPS pole.

God this guy did a nice job. He worked a miracle on my (formerly) sloped property, and left me with a rock retaining wall to support the driveway and a nice rock border on the up-slope side of the driveway that tied into the wall we cut the driveway through. The septic job is his next year if he wants it.

I was surprised to find that the electrician had already put up the board for the temporary power, but disappointed to see that CVPS hadn't yet hooked it up. In a call to CVPS yesterday, they said the weather has been lousy and they hoped to have it in place next week - not good as we're supposed to begin building the floor this weekend. That will add 2 day's rental of a generator to my costs - about $120.

Turned out that the measurements were different from my assumptions, but not enough to have been fatal. No fox sightings this time, but I was visited by a bright yellow bird with black wings that I've never seen in the 'burbs.

Next weekend begins 'Phase Two'. Our goal: Lay down the sills and get the floor framed in preparation for help from my sister's family a the end of June.